top of page

Any Custom Size Available

Custom Size Request a Quote

 

 

Manufactured monuments are ones that are made at the factory instead of being constructed on site. They are much more affordable and can be shipped to any desired location. Custom monument signs are manufactured using an engineered system of polymer-based materials. The result is a sign, which is incredibly strong yet light. Manufactured monument signs are installed on two simple mounting poles. The poles are positioned in post holes and the post holes are then filled with concrete for stability. Royal Foam Monuments are a great way to stand out of the crowd of your competitors, to show your individuality, to make your logo more recognizable, and attract more and more new customers to your company!

 

Disclaimer: 

By proceeding with the order you state, that you understand that this is a confirmation page, and the product listed herein is exactly to your request, specification and that no cancellation or return of order will be accepted after the order is placed. This order is special and custom, lead time is subject to change without notice .You understand and agree that all payments on this project are final and no chargeback is possible. All claims are being considered within 2 days upon the receipt of the product. After 2 days claims will not be considered. All past due invoices are subject to a monthly interest rate of 1.5% plus all legal and attorney fees. 


PAYMENT IS UNDERSTOOD AS AN ACCEPTANCE OF THE TERMS AND CONDITIONS STATED ABOVE.

MS 045

SKU: 0315
$5,250.00Price
  • Our stucco monument signs are fabricated in what is commonly referred to in the construction industry as an EIFS stucco system. Here are the technical details and materials used in architectural sign fabrication.

     

    1. CORE OF STRUCTURE IS MOLDED EXPANDED POLYSTYRENE (1#CF).
    2. FAST CURE URETHANE, IMPACT RESISTANT SAFEGUARD-COATING™.
    3. TEXTURED FINISHED SURFACE IS 100% AGGREGATED ACRYLIC.
    4. 3″ OR 4″ PVC (SCHEDULE 40) PIPE IS BONDED INTO CENTER OF STRUCTURE.
    5. STEEL PIPE IS INSERTED DURING INSTALLATION AND SECURED WITH EXPANDING POLYMERIC RESIN FOAM.CONCRETE FOOTING (AS REQUIRED BY LOCAL LAW).

    Price does not include an installation pipe, letters and logo. 

Pay over time Billd Credit  up to 120 days

Minimum purchase 5K , Annual revenue > 500K , FICO® Scores >600

217389588_4266948190028462_6455435226645879285_n (1).jpg

All Product Categories

Related Product

bottom of page